Process Safety :
- Validating line up changing
- Following start up and shutdown procedures
- Taking mitigating measures for overrides
- Never leave draining unattended
- Using 2 barriers for drains and vents
- No hose connection to utilities without a risk assessment
- Verifying equipment is pressure free before maintenance
- Assuring mechanical completion after maintenance
- Making no changes without MOC
12 Safety Rules :
- Overriding safety controls
- Confined space entry
- Driving
- Energy Isolation
- Hot work
- Line of Fire
- Mechanical lifting operation
- Permit to Work (PTW)
- Working at Height
- Personal Protective Equipment
- Overhead Power Line
- Alcohol and Drugs